Whole Foods Post Oak
Project: Need temporary parking lot for 2.5 months Required complete ready to use within 2 weeks Required ADA and high-heel usage Required strength and stability Results: Minimized subsurface and Gravel/Grass Pavers Added Geotextile to support stability Used SuperSpots to parking delineation Was ready for use within 1 week