Whole Foods Post Oak

Project:
  • Need temporary parking lot for 2.5 months
  • Required complete ready to use within 2 weeks
  • Required ADA and high-heel usage Required strength and stability
Results:
  • Minimized subsurface and Gravel/Grass Pavers
  • Added Geotextile to support stability
  • Used SuperSpots to parking delineation
  • Was ready for use within 1 week