Whole Foods Post Oak

Project: Need temporary parking lot for 2.5 months Required complete ready to use within 2 weeks Required ADA and high-heel usage Required strength and stability Results: Minimized subsurface and Gravel/Grass Pavers Added Geotextile to support stability Used SuperSpots to parking delineation Was ready for use within 1 week

Forest Club

Project: Overflow parking was required Natural landscape required Erosion and stormwater control Easy maintenance Results: Permeable subsurface and Gravel/Grass Pavers Infrastructure support to drains

Hunters Creek Village

Project Issues Standing water at driveway entrance Erosion of landscape Problematic stormwater drainage Goals Met Permeable subsurface and Gravel/Grass Pavers Additional drainage support to city connection

Permeable Pavers Houston Heights

Project Issues: Small areas with little sunlight Stability and Safety Permeability required Visually aesthetic around drains Goals Met: Permeable subsurface and Permeable Pavers Stability for all uses